
Brisbane’s South Bank is seeking private-sector partners to help redevelop the popular precinct ahead of the 2032 Olympic and Paralympic Games, with plans including a new lagoon and upgraded public spaces.
South Bank Partnership Initiative
The Queensland Government and South Bank Corporation have invited industry to register interest in a potential partnership to renew the precinct. The focus area spans 4.8 hectares around the Main Lagoon and surrounding parkland, retail, and public spaces, rather than the full 42-hectare South Bank Corporation precinct.
The existing Streets Beach lagoon loses up to 112,000 liters of water daily at peak levels and requires regular maintenance, according to the state government. The precinct attracts over 16.6 million visits annually, making it one of Brisbane’s busiest visitor destinations.
The prequalification process aims to gauge industry interest and capability before procurement decisions. Proposals would need to deliver a new lagoon and improved public space, explore integrated commercial development, and enhance connections across the precinct. The indicative timetable targets prequalification submissions by December 2026, with a preferred proponent selected by late 2027, subject to approvals.
Read Also: Victoria approves $14.9 billion Melbourne industrial megaproject
Eastern Bayside Masterplan
Separately, Brisbane City Council has released a draft 20-year masterplan covering 8 kilometers of foreshore across Wynnum, Manly, and Lota. The plan encompasses 15 parks and waterfront recreation facilities, shaped by approximately 1,460 pieces of community feedback.
At Wynnum, the existing wading pool could become a sand beach pool with deck areas. Manly might gain a new jetty, mangrove boardwalk, kayak launch facilities, and a waterplay and parkour park. The draft also proposes expanding Pandanus Beach, adding picnic shelters, seating, barbecues, and improving walking and cycling paths.
Community feedback emphasized demand for better water access, more swimming opportunities, shade, and recreational spaces, while stressing the need to protect the foreshore’s natural environment and established character. The draft masterplan is open for public consultation until November 22, with the final plan expected in early 2027.
Broader Waterfront Renewal Plans
The Queensland Government has linked the South Bank renewal to preparations for the 2032 Olympic and Paralympic Games. The South Bank Corporation’s Future South Bank Master Plan, released in 2024, sets the long-term direction for the precinct. Any proposals from the current industry process must undergo further community engagement, planning, and statutory approvals before proceeding.